EX-10.30
from 10-K
~20
pages
Date Service Description Qty Rate Amount 04/26/2022 Rental System Installation Travel and Per Diem 1 5,500.00 5,500.00 04/27/2022 Rental System Installation Receive and Set Units in Place, Install Air Inlet Hoods and Shipped Loose Hardware 3 2,500.00 7,500.00 04/29/2022 Rental System Installation Supply and Install Hdpe Gas Piping and Shutoff Valves for Each C1000 and Blind Flange for Expansion 1 62,500.00 62,500.00 04/29/2022 Rental System Installation Install Cge Supplied Power Cables and Cable Tray to Each C1000 and Mining Box. Installation Hardware Supplied by Cesc 1 49,530.00 49,530.00 05/03/2022 Rental System Installation Install Cge Supplied Gas Filter and Regulator Skid 1 5,275.00 5,275.00 05/03/2022 Rental System Installation Supply and Install Control Cable Conduits to Each C1000 1 16,800.00 16,800.00 05/04/2022 Rental System Installation Install Cge Supplied Pc for Remote Communications 1 3,450.00 3,450.00 05/05/2022 Rental System Installation Modify C1000 for Flatpac Control Scheme, Program Unit Unit #1 C1k Control for Master Operation 1 5,420.00 5,420.00 05/06/2022 Rental System Installation Commission Units for 3mw Standalone Operation 1 4,500.00 4,500.00 $20,000.00 Deposit to Start Balance Due at Com Pletion Total $160,475.00 Accepted by Accepted Date
12/34/56